PDA

View Full Version : @ Palm Lodge


palmlodge
05-02-2006, 09:57 AM
Pics of my install. All the CBUS equipment is next to the Consumer unit, except for a PCI (Com port) which is fed to an MSS100 (Serial to Ethernet), and a Comfort to CBUS UCM - these 2 modules are in their own cabinet in Node 0.

I have 6 DLT's and 11 4-button Saturns. Some DLT's control Comfort relays (ie garage door, side gates) and also start/stop the Sonos system.

There's another 12-way relay and another Hager VB54R cabinet sitting here waiting to be installed - I'll do that in the next few weeks.

Forumadmin
05-02-2006, 10:03 AM
g,
Nice install there, keep them coming.

cheers

palmlodge
05-02-2006, 10:12 AM
When I put the extra relay/cabinet in, I'll also be re-wiring to support UPS.

I shall UPS the CBUS Network - ie the switches and the internal DIN unit power. And also a few lights (ie the LED's on the stairs). Everything else stays the same. It's all off a domestic single phase, so shouldnt have any issues.

As Comfort can detect a power cut, it can trigger a response - and in this case as the CBUS network is still powered....

I'll prob just hang it off the rack mounted UPS - it can keep Node0 going for about 6 hours - and there's a lot of stuff in there.